Client
Ministry of Housing, Utilities & Urban Communities – Alamein City Authority
Start Year
2022
Status
Under Study
Location
Under Study
Duration
Concord for Engineering & Contracting
Project Overview
The bridge forms a vital connection along the high-speed rail alignment and features a hybrid structural system consisting of: Pre-cast concrete beams and Steel bays The total length of the bridge segment is 350 meters, with a deck width of 28.6 meters, ensuring high capacity and structural efficiency.
Our Role
As the Structural Designer and Engineering Consultant for the executing contractor, JCE’s scope included:
1-Structural design and analysis
2-Planning and coordination
3-Preparation of all structural design and construction drawings
4-Full technical support throughout execution
Gallery Project













[Build Together]
Transforming Ideas Into Solid Construction Results
Partner with our expert construction team to bring your vision to life — on time, on budget, and with the highest standards of quality and precision.
