Project Overview
The bridge forms a vital connection along the high-speed rail alignment and features a hybrid structural system consisting of:
Pre-cast concrete beams and
Steel bays
The total length of the bridge segment is 350 meters, with a deck width of 28.6 meters, ensuring high capacity and structural efficiency.